Special Collections
|
|
|
NO. |
DATE |
DESCRIPTION |
|
1 |
3/8/67 |
Fourth Floor Plan (Furniture Plan) |
|
2 |
4/21/75 |
Training Center in Garage |
|
3 |
5/2/77 |
Grounds Plan |
|
4 |
2/6/80 |
West Wing- Eighth Level |
|
5 |
2/5/54 |
Proposed Pump House for Well |
|
6 |
4/7/53 |
Proposed Extension- Northwardly to Wells Avenue |
|
7 |
11/4/49 |
Office of Chief Engineer-Proposed New Wing (Second, Third, Fourth Floors) |
|
8 |
11/4/49 |
Office of Chief Engineer-Proposed New Wing (Main Floor) |
|
9 |
11/4/49 |
Office of Chief Engineer-Proposed New Wing (Second, Third, Fourth Floors) |
|
10 |
11/4/49 |
Office of Chief Engineer-Proposed Extension (West Elevation) |
|
11 |
7/2/54 |
Exterior Elevation |
|
12 |
8/3/55 |
Proposed Raising of Manhole over Pumphouse For Well |
|
13 |
No Date |
Outside Face of South Curb |
|
14 |
10/2/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
15 |
12/11/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
16 |
12/11/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
17 |
12/10/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
18 |
12/11/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
19 |
12/10/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
20 |
12/4/59 |
Proposed Exhibition Room and Swimming Pool Room |
|
21 |
7/25/58 |
Proposed Exhibition Room |
|
22 |
10/8/59 |
Proposed Exhibition Room and Swimming Pool |
|
23 |
8/29/63 |
Proposed Auditorium |
|
24 |
11/?/64 |
Proposed Pool Enclosure |
|
25 |
11/?/64 |
Pool Enclosure Details-Proposed Pool Enclosure |
|
26 |
11/?/64 |
Plan and Elevations-Proposed : Pool Enclosure |
|
27 |
11/?/64 |
Pool Enclosure Details-Proposed Pool Enclosure |
|
28 |
5/15/62 |
Alterations in Connection with Swimming Pool |
|
29 |
No Date |
New Gas Chlorination System |
|
30 |
12/13/63 |
Toilet Facilities for Bathers |
|
31 |
9/5/63 |
Toilet Facilities for Bathers |
|
32 |
5/17/63 |
New Motor Inn Entrance Northeast Wing |
|
33 |
5/17/63 |
New Motor Inn Entrance Northeast Wing |
|
34 |
1/17/64 |
New Steel Ladder Fire Escape for Accounting Office |
|
35 |
9/8/67 |
Alterations to First Floor Northeast Wing |
|
36 |
9/8/67 |
Alterations to First Floor Northeast Wing |
|
37 |
8/?/? |
Alterations to First Floor Northeast Wing |
|
38 |
9/8/67 |
Alterations to First Floor Northeast Wing |
|
39 |
4/10/70 |
Laundry |
|
40 |
4/10/70 |
Laundry |
|
41 |
4/10/70 |
Laundry |
|
42 |
4/10/70 |
Laundry |
|
43 |
4/10/70 |
Laundry |
|
44 |
4/10/70 |
Laundry |
|
45 |
4/10/70 |
Laundry |
|
46 |
No Date |
Air Conditioning Study |
|
47 |
11/12/70 |
Air Conditioning Study |
|
48 |
11/12/70 |
Proposed Central Chilled Water Installation |
|
49 |
11/12/70 |
Air Conditioning Study |
|
50 |
11/12/70 |
Air Conditioning Study |
|
51 |
11/12/70 |
Basement Floor Plan |
|
52 |
4/30/62 |
Alterations in Connection with Swimming Pool |
|
53 |
8/1/63 |
Showing Auditorium over Garage Parking Lot |
|
54 |
3/27/72 |
Installation of New Air Conditioning System Replacing Existing Air Conditioning |
|
55 |
3/27/72 |
Installation of New Air Conditioning System Replacing Existing Air Conditioning |
|
56 |
3/27/72 |
Installation of New Air Conditioning System Replacing Existing Air Conditioning |
|
57 |
4/25/47 |
Details Escalator |
|
58 |
5/5/47 |
Track Level Plan-Heating |
|
59 |
12/16/48 |
Track Level Plan-Heating and Ventilation |
|
60 |
5/5/47 |
First Floor Plan-Heating |
|
61 |
5/5/47 |
Track Level Plan-Air Conditioning |
|
62 |
5/5/47 |
First Floor Plan-Air Conditioning |
|
63 |
5/5/47 |
First Floor Plan-Air Conditioning |
|
64 |
5/5/47 |
Track Level Plan-Plumbing |
|
65 |
5/5/47 |
Track Level Plan-Plumbing |
|
66 |
5/5/47 |
Track Level Plan-Plumbing |
|
67 |
12/16/48 |
Track Level Plan-Plumbing |
|
68 |
12/16/48 |
Track Level Plan-Plumbing |
|
69 |
12/16/48 |
Track Level Plan-Plumbing |
|
70 |
5/5/47 |
First Floor Plan-Plumbing |
|
71 |
5/5/47 |
First Floor Plan-Plumbing |
|
72 |
5/5/47 |
First Floor Plan-Plumbing |
|
73 |
5/5/47 |
Roof Plan-Plumbing |
|
74 |
5/5/47 |
Roof Plan-Plumbing |
|
75 |
5/5/47 |
Roof Plan-Plumbing |
|
76 |
5/5/47 |
Site Plan and Riser Diagram-Plumbing |
|
77 |
5/5/47 |
Site Plan and Riser Diagram-Plumbing |
|
78 |
5/5/47 |
Site Plan and Riser Diagram-Plumbing |
|
79 |
12/13/48 |
Elevations and Plan |
|
80 |
12/13/48 |
Elevations and Plan |
|
81 |
12/13/48 |
Door and Window Details |
|
82 |
4/25/47 |
Track Level Plan |
|
83 |
4/25/47 |
Door and Window Details |
|
84 |
4/25/47 |
Track Level Plan |
|
85 |
4/25/47 |
Ground Floor Plan |
|
86 |
4/25/47 |
North and South Elevations |
|
87 |
4/25/47 |
North and South Elevations |
|
88 |
4/25/47 |
East and West Elevations |
|
89 |
4/25/47 |
East and West Elevations |
|
90 |
4/25/47 |
Sections |
|
91 |
4/25/47 |
Details-Concourse |
|
92 |
4/25/47 |
Details-Concourse |
|
93 |
4/25/47 |
Details, Stairs, Escalator |
|
94 |
4/25/47 |
Details, Stairs, Escalator |
|
95 |
4/25/47 |
Interior Elevations |
|
96 |
4/25/47 |
Interior Elevations |
|
97 |
4/25/47 |
Terrazzo Plan |
|
98 |
4/25/47 |
Terrazzo Plan |
|
99 |
4/25/47 |
Terrazzo Plan |
|
100 |
No Date |
Door and Finish Schedule |
|
101 |
No Date |
Door and Finish Schedule |
|
102 |
No Date |
Door and Finish Schedule |
|
103 |
5/5/47 |
Track Level Plan-Electrical |
|
104 |
5/5/47 |
Track Level Plan-Electrical |
|
105 |
5/5/47 |
First Floor Plan-Electrical |
|
106 |
5/5/47 |
First Floor Plan-Electrical |
|
107 |
5/5/47 |
Site Plan and Riser Diagram-Electrical |
|
108 |
7/25/48 |
Return Air Grilles-Waiting Room |
|
109 |
2/18/48 |
Fresh Air Intake and Transformer Vault |
|
110 |
2/18/48 |
Fresh Air Intake and Transformer Vault |
|
111 |
No Date |
Popoesed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
112 |
6/29/33 |
Final Record of Paving of Driveway Between Jefferson Street and Hotel Roanoke |
|
113 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
114 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
115 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
116 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
117 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
118 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
119 |
7/18/34 |
Poposed Widening of Shenandoah Ave. Adjacent to Hotel Roanoke Grounds |
|
120 |
9/30/53 |
Coffee Shop Plan |
|
121 |
2/6/80 |
West Wing-Eighth Level(Fire Protection) |
|
122 |
3/27/72 |
Installation of New Air Conditioning System Replacing Existing Air Conditioning |
|
123 |
11/22/83 |
Air Conditioning Study |
|
124 |
11/22/83 |
Preliminary Floor Plan-Second Floor |
|
125 |
11/22/83 |
Preliminary Floor Plan-Third Floor |
|
126 |
11/22/83 |
Preliminary Floor Plan-Fourth Floor |
|
127 |
11/22/83 |
Preliminary Floor Plan-Fifth Floor |
|
128 |
2/6/80 |
West Wing-Sixth Level(Fire Protection) |
|
129 |
2/6/80 |
West Wing-Seventh Level(Fire Protection) |
|
130 |
12/17/37 |
Plan of Basement |
|
131 |
12/2/37 |
Plan of Second Floor |
|
132 |
12/9/37 |
Plan of Fourth Floor |
|
133 |
12/9/37 |
Plan of Fifth Floor |
|
134 |
5/13/31 |
Addition-Northeast Wing |
|
135 |
4/25/31 |
Addition-Northeast Wing Basement Plan |
|
136 |
5/28/31 |
Addition-Northeast Wing (Pipe Space and First Floor Plans) |
|
137 |
6/13/31 |
Addition-Northeast Wing-Second,Third,Fourth Floor Plans |
|
138 |
6/18/31 |
Addition-Northeast Wing-Fifth Floor and Roof Plans |
|
139 |
3/21/31 |
Electric Light, Power, Telephone and Bell System, New General Office Building(First Floor Plan) |
|
140 |
No Date |
Revisions |
|
141 |
No Date |
Plot Plan |
|
142 |
9/30/53 |
Key Plan-Basement Floor Plan |
|
143 |
9/30/53 |
Key Plan-First Floor |
|
144 |
9/30/53 |
Key Plan-Second,Third,Fourth Floor Plan |
|
145 |
9/30/53 |
Key Plan-Fifth Floor Plan |
|
146 |
9/30/53 |
Basement-Ground Floor Plan |
|
147 |
9/30/53 |
First Floor Plan |
|
148 |
9/30/53 |
Second,Third, Fourth Floor Plans |
|
149 |
9/30/53 |
Fifth Floor Plan |
|
150 |
9/30/53 |
Roof,Penthouse,Machinery |
|
151 |
9/30/53 |
East and West Elevations |
|
152 |
9/30/53 |
North Elevations and South Elevations at Penthouse |
|
153 |
9/30/53 |
Wall Sections |
|
154 |
9/30/53 |
Window Details |
|
155 |
9/30/53 |
Stair Details and Elevator Shaft |
|
156 |
9/30/53 |
Typical Bedroom-Bathroom and Details |
|
157 |
9/30/53 |
Miscellaneous Details |
|
158 |
9/30/53 |
Room Finish Schedule |
|
159 |
9/30/53 |
Door Schedule |
|
160 |
9/30/53 |
Door Frame Details |
|
161 |
9/30/53 |
Door Frame Details-Continued |
|
162 |
9/30/53 |
Coffee Shop Plan |
|
163 |
9/30/53 |
Coffee Shop Ceiling Plan and Details |
|
164 |
9/30/53 |
coffee Shop-Wall Elevations |
|
165 |
9/30/53 |
Coffee Shop Details |
|
166 |
9/30/53 |
Exhibition Room-Plan and Details |
|
167 |
9/30/53 |
Exhibition Room-Ceiling Plan |
|
168 |
9/30/53 |
Exhibition Room-Wall Elevations and Details |
|
169 |
9/30/53 |
Main Kitchen Equipment Plans and Details |
|
170 |
9/30/53 |
Coffee Shop Kitchen and Cafeteria Kitchen-Equipment Plan |
|
171 |
9/30/53 |
Foundation Plan |
|
172 |
9/30/53 |
First Floor-Framing Plan |
|
173 |
9/30/53 |
Second Floor-Framing Plan |
|
174 |
9/30/53 |
Third and Fourth Floor Framing Plan |
|
175 |
9/30/53 |
Fifth Floor Framing Plan |
|
176 |
9/30/53 |
Roof Framing Plan |
|
177 |
9/30/53 |
Column Schedule and Miscellaneous Details |
|
178 |
9/30/53 |
Miscellaneous Details |
|
179 |
9/30/53 |
Basement Plan |
|
180 |
9/30/53 |
First Floor Plan |
|
181 |
9/30/53 |
Second,Third, Fourth Floor Plans-Typical |
|
182 |
9/30/53 |
Fifth Floor Plan |
|
183 |
9/30/53 |
Coffee Shop Plan |
|
184 |
9/30/53 |
Details |
|
185 |
9/30/53 |
Schedules,Legends,Diagrams |
|
186 |
9/30/53 |
Basement Floor Plan |
|
187 |
9/30/53 |
First Floor Plan |
|
188 |
9/30/53 |
Second,Third,Fourth Floor Plans |
|
189 |
9/30/53 |
Fifth Floor Plan |
|
190 |
3/27/72 |
Installation of New Air Conditioning System |
|
191 |
3/27/72 |
Installation of New Air Conditioning System |
|
192 |
7/29/74 |
Equipment Room Plan-Chilled Water Valve-Control Schedule |
|
193 |
7/12/72 |
Installation of New Air Conditioning |
|
194 |
3/27/72 |
Installation of New Air Conditioning |
|
195 |
No Date |
Title Page |
|
196 |
1/5/73 |
Ballroom Plan,Legend,Miscellaneous Details |
|
197 |
11/12/70 |
Proposed System Additions-First Floor Plan |
|
198 |
1/5/73 |
Partial Basement Plan-Miscellaneous Details |
|
199 |
1/5/73 |
AC-L Fan Room Plan, Equipment Notes |
|
200 |
1/5/73 |
Partial Basement Plan |
|
201 |
1/5/73 |
Shenandoah Room-AC-S Fan Room, Miscellaneous Sections |
|
202 |
1/5/73 |
Partial First Floor and Mezzanine Plan |
|
203 |
1/5/73 |
Partial First Floor Plan |
|
204 |
1/5/73 |
Partial Second and Fifth Plan,Fan Room Plan, Details |
|
205 |
1/5/73 |
Sixth,Seventh,Eighth and Eighth Floor Mezzanine Plans, Details |
|
206 |
5/30/73 |
Sixth and Seventh Floor Plan |
|
207 |
5/30/73 |
Sixth and Seventh Floor Plan |
|
208 |
1/5/73 |
Pneumatic Temperature and Electric Sequence Controls, Control Legend, Details |
|
209 |
10/16/72 |
Sixth, Seventh, Eighth and Eighth Floor Mezzanine Plans, Details |
|
210 |
No Date |
Air Conditioning Renovation |
|
211 |
No Date |
Air Conditioning Renovation |
|
212 |
10/16/72 |
Fifth Floor Plan-Details |
|
213 |
No Date |
Fourth Floor-Not used plan |
|
214 |
10/16/72 |
Second Floor Plan-Partial Third and Fourth Floor Plans |
|
215 |
3/14/73 |
Terrace Enclosure |
|
216 |
3/14/73 |
Terrace Enclosure |
|
217 |
3/14/73 |
Terrace Enclosure |
|
218 |
3/14/73 |
Terrace Enclosure |
|
219 |
4/21/75 |
Training Center in Garage Area |
|
220 |
4/21/75 |
Training Center in Garage Area |
|
221 |
4/21/75 |
Training Center in Garage Area |
|
222 |
4/21/75 |
Training Center in Garage Area |
|
223 |
4/21/75 |
Training Center in Garage Area |
|
224 |
4/21/75 |
Training Center in Garage Area |
|
225 |
4/21/75 |
Training Center in Garage Area |
|
226 |
4/21/75 |
Training Center in Garage Area |
|
227 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
228 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
229 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
230 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
231 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
232 |
No Date |
Renovating Barber Shop and Health Center Areas of Hotel Roanoke for Railroad Lounge |
|
233 |
4/24/74 |
Proposed Alterations Lower Level |
|
234 |
10/1/75 |
Entrance to Railroad Lounge |
|
235 |
11/15/54 |
Service Station for Kimball Parking Lot |
|
236 |
11/16/54 |
Service Station for Kimball Parking Lot |
|
237 |
11/17/54 |
Service Station for Kimball Parking Lot |
|
238 |
11/18/54 |
Service Station for Kimball Parking Lot |
|
239 |
11/19/54 |
Service Station for Kimball Parking Lot |
|
241 |
5/27/09 |
Proposed Alterations |
|
242 |
6/3/09 |
General Plan of Second, Thirdth, Fourth Plans |
|
243 |
9/30/1898 |
Kitchen Wing |
|
244 |
1/16/06 |
Plan of Proposed Gates |
|
245 |
9/28/25 |
Part I-Second Floor Plan(not used) |
|
246 |
No Date |
Partial Third Floor Plan |
|
247 |
9/28/25 |
Plan of Fourth Floor Tower Room, Fifth Floor Tower Room |
|
248 |
No Date |
Plan of Basement |
|
249 |
3/26/31 |
Proposed Fire Escape (Jefferson St. End) |
|
250 |
11/12/25 |
Proposed Private Bathrooms |
|
251 |
7/3/31 |
New Concrete Floor Replacing Wood Floor in Kitchen |
|
252 |
2/14/68 |
Section Above Purling Attach |
|
253 |
12/1/67 |
Anchor Bolt Guide |
|
254 |
No Date |
Base Plate |
|
255 |
9/18/67 |
Swimarium-Wall Column Base Assembly |
|
256 |
9/18/67 |
Swimarium-Wall Bottom Rail Assembly |
|
257 |
9/18/67 |
Swimarium-Wall Purling Assembly |
|
258 |
9/19/67 |
Swimarium-Wall Eave Assembly |
|
259 |
9/19/67 |
Swimarium-Roof Rafter to Wall Column Assembly |
|
260 |
9/21/67 |
Swimarium-Ridge Assembly |
|
261 |
9/22/67 |
Swimarium-Stationary Roof Panel Assembly |
|
262 |
9/25/67 |
Sliding Panel Mechanism Assembly |
|
263 |
9/25/67 |
Swimarium-Fiberglass Assembly to Bottom Rail |
|
264 |
9/27/67 |
Swimarium-Gable Fiberglass Assembly |
|
265 |
11/1/67 |
Swimarium-Sliding Panel Assembly |
|
266 |
10/23/67 |
Swimarium-Section Views |
|
267 |
No Date |
Final Approved Plans |
|
268 |
No Date |
no title |
|
269 |
11/8/67 |
no title |
|
270 |
11/10/67 |
Gable Wall Column Setting |
|
271 |
11/20/67 |
Section through Fiberglass |
|
272 |
11/21/67 |
Section through Plexiglass |
|
273 |
11/24/67 |
Sections thru Gable Showing Removable Plexi Panels and Fixed Fiberglass Panels |
|
274 |
12/1/67 |
no title |
|
275 |
11/27/67 |
ripped |
|
276 |
12/5/67 |
Roof Raft |
|
277 |
12/5/67 |
Gear motor Mounting For Hotel Roanoke |
|
278 |
12/5/67 |
Section Through Plexiglass Side Wall |
|
279 |
12/11/67 |
Passageway Enclosure for Hotel Roanoke |
|
280 |
12/7/67 |
Passageway Enclosure |
|
281 |
12/13/67 |
Section Through Corner |
|
282 |
No Date |
no title |
|
283 |
No Date |
Kitchen Equipment Layouts |
|
284 |
No Date |
Kitchen Equipment Layouts |
|
285 |
No Date |
Kitchen Equipment Layouts |
|
286 |
No Date |
Dining Room Plan |
|
287 |
7/21/45 |
Detailed Plan of Basement |
|
288 |
7/22/45 |
Mezzanine Floor Plan |
|
289 |
7/23/45 |
First Floor Plan |
|
290 |
7/24/45 |
Second Floor Plan |
|
291 |
7/25/45 |
Third and Fourth Floor Plan |
|
292 |
7/26/45 |
Fifth Floor and Attic Plans |
|
293 |
7/27/45 |
Plumbing Riser Diagrams and Plans of Bathroom Piping |
|
294 |
7/28/45 |
Diagrams of Plumbing Risers, Toilet Exhaust Ducts and Heating and Cooling Risers |
|
295 |
7/29/45 |
Detailed Plan of Basement |
|
296 |
10/12/70 |
Air Conditioning Study |
|
297 |
5/17/63 |
Parking Lot |
|
298 |
5/1/62 |
Swimming Pool Installation |
|
299 |
4/10/62 |
Swimming Pool Installation |
|
300 |
4/10/62 |
Swimming Pool Installation |
|
301 |
4/10/62 |
Swimming Pool Installation |
|
302 |
4/10/62 |
Swimming Pool Installation |
|
303 |
4/10/62 |
Swimming Pool Installation |
|
304 |
7/18/61 |
Detailed Installation of Swimmaster Skimmer |
|
305 |
9/30/53 |
Coffee Shop Ceiling Plan and Details |
|
306 |
9/30/53 |
Coffee Shop Wall Elevations |
|
307 |
9/30/53 |
Coffee Shop Details |
|
308 |
9/30/53 |
Coffee Shop Plan |
|
309 |
9/30/53 |
Schedules, Legends, Diagrams |
|
310 |
No Date |
Coffee Shop-Kitchen Plan |
|
311 |
5/19/31 |
Electric Light and Power Circuits |
|
312 |
5/19/31 |
Electric Light and Power Circuits |
|
313 |
5/19/31 |
Electric Light and Power Circuits |
|
314 |
5/19/31 |
Electric Light and Power Circuits |
|
315 |
5/19/31 |
Electric Light and Power Circuits |
|
316 |
5/19/31 |
Electric Light and Power Circuits |
|
317 |
5/19/31 |
Electric Light and Power Circuits |
|
318 |
5/19/31 |
Electric Light and Power Circuits |
|
319 |
5/19/31 |
Electric Light and Power Circuits |
|
320 |
1/5/73 |
Title Page |
|
321 |
1/5/73 |
Ballroom Plan, Legend, Miscellaneous Details |
|
322 |
1/5/73 |
Partial Basement Plan, Miscellaneous Details |
|
323 |
1/5/73 |
AC-L Fan Room Plan, Equipment Notes |
|
324 |
1/5/73 |
Partial Basement Plan |
|
325 |
1/5/73 |
Shenandoah Room-AC-S Fan Room, Miscellaneous Sections |
|
326 |
1/5/73 |
Partial First Floor and Mezzanine Plan |
|
327 |
1/5/73 |
Partial First Floor and Mezzanine Plan |
|
328 |
1/5/73 |
Partial Second and Fifth Floor Plans, Fan Room Plan, Details |
|
329 |
1/5/73 |
Sixth, Seventh, Eighth, Eighth Floor Mezzanine Plans, Details |
|
330 |
1/5/73 |
Pneumatic Temperature and Electric Sequence Controls, Control Legend, Details |
|
331 |
1946 |
Detail of Display Case |
|
332 |
1946 |
Section through Unit Enclosure |
|
333 |
No Date |
Beauty Shop Office |
|
334 |
8/12/46 |
Fountain Room Details |
|
335 |
2/19/47 |
Plan of Shelving in Check Room |
|
336 |
9/18/46 |
Conference Room Revisions |
|
337 |
10/31/46 |
Lounge at Fountain Room-Revised Lighting |
|
338 |
No Date |
Passage to Fountain Room |
|
339 |
No Date |
Plan Rack for Engineers Office |
|
340 |
7/16/46 |
Additional Exit Stair No.2 |
|
340 |
No Date |
Full Size Section |
|
341 |
7/16/46 |
Additional Exit Stair No.3 |
|
342 |
7/16/46 |
Additional Exit Stair No.4 |
|
343 |
10/7/46 |
Bench Support Fountain Room |
|
344 |
10/7/46 |
Col. #43 Fountain Room |
|
345 |
5/1/46 |
Curtain Box |
|
346 |
8/15/46 |
Typical Paneling in Corridors |
|
347 |
12/2/46 |
Mirror in Corridors |
|
348 |
11/7/46 |
Health Club |
|
349 |
9/12/46 |
Cabinets in Beauty Shop Booths |
|
350 |
3/14/47 |
Detail of Soiled Linen Hamper for Dining Room |
|
351 |
1/2/47 |
Masonry Base for Broilers |
|
352 |
10/9/46 |
Wood Slat Mats for Kitchen |
|
353 |
8/8/46 |
Layout of Furring and Window Stools |
|
354 |
2/3/47 |
Cashier's Counter and Pipe Case |
|
355 |
8/15/46 |
Wood and Glass Part N Manager's Suite |
|
356 |
9/20/46 |
Cashier's Booth and Room Service Counter |
|
357 |
12/16/46 |
Revised Cashiers Window in Lobby |
|
358 |
No Date |
Elevation of Key and Letter Rack |
|
359 |
7/21/45 |
Plot Plan |
|
360 |
7/21/45 |
Key Plan-Basement Floor |
|
361 |
7/21/45 |
Key Plan-Main and Mezzanine Floors |
|
362 |
7/21/45 |
Key Plan-First Floor |
|
363 |
7/21/45 |
Key Plan-Second and Third Floors |
|
364 |
7/21/45 |
Key Plan-Fourth Floor |
|
365 |
7/21/45 |
Key Plan-Sixth and Seventh Floors |
|
366 |
7/21/45 |
Basement Floor Plan |
|
367 |
7/21/45 |
Mezzanine Floor Plan |
|
368 |
7/21/45 |
First Floor Plan |
|
369 |
7/21/45 |
Second Floor Plan |
|
370 |
7/21/45 |
Third and Fourth Floor Plans |
|
371 |
7/21/45 |
Roof Plan |
|
372 |
7/21/45 |
South Elevation |
|
373 |
7/21/45 |
East and West Elevation |
|
374 |
7/21/45 |
North Elevation |
|
375 |
7/21/45 |
Sections"A_A", "B-B","C-C" |
|
376 |
7/21/45 |
Scale Details of Large Gables |
|
377 |
7/21/45 |
Scale Details of Small Gables |
|
378 |
7/21/45 |
Spandriel Details |
|
379 |
7/21/45 |
Details of Elevator Shaft of Stairs |
|
380 |
7/21/45 |
Mezzanine Corridor Details |
|
381 |
7/21/45 |
Meeting and Conference Rooms Details |
|
382 |
7/21/45 |
Meeting and Conference Rooms Details |
|
383 |
No Date |
Beauty Parlor Details |
|
384 |
7/21/45 |
Details of Typical Bedroom, Bath, Closet, Door Frame, and Saddles |
|
385 |
7/21/45 |
Bathroom Details |
|
386 |
7/21/45 |
Bathroom Details |
|
387 |
7/21/45 |
Bathroom Details |
|
388 |
7/21/45 |
Miscellaneous Details |
|
389 |
7/21/45 |
Miscellaneous Details |
|
390 |
7/21/45 |
Door Schedule |
|
391 |
7/21/45 |
Footing and Foundation Plan |
|
392 |
3/19/46 |
Revised Foundation Plan |
|
393 |
7/21/45 |
Mezzanine Floor Framing Plan |
|
394 |
7/21/45 |
First Floor Framing Plan |
|
395 |
7/21/45 |
Second Floor Framing Plan |
|
396 |
7/21/45 |
Third Floor Framing Plan |
|
397 |
7/21/45 |
Fourth Floor Framing Plan |
|
398 |
7/21/45 |
Fifth Floor Framing Plan |
|
399 |
7/21/45 |
Roof and Attic Framing Plan |
|
400 |
7/21/45 |
Roof Framing Plans |
|
401 |
7/21/45 |
Roof Frami |